1, in the 1 to 2 level loading superior soil site work, should not be operating in drydust and damp clay zone.
2, before the work deal with loader is examined, tire pressure, the hydraulic pipehydraulic control valve is normal joints, each lubricating part whether the lack of oil,to confirm the normal before start.
3, Lixin professional pipe joint called should always pay attention to the people around the situation before operation, especially when backing a car, more attention should be paid to any pedestrians behind, in the work process, prohibited any upper and lower mechanical, transfer the objects, and sitting in the bucket or rack.
In 4, uneven ground running and turning, is strictly prohibited scraper bucket to ascend to the highest position.
5, on the ramp may not warranty work, Lixin professional pipe joint said no turning,reversing and parking on steep slopes, on the slope of the flame when the bucket floor, brake solidly, re start.
6, night work, scene lighting should be fully intact.
7, when the operation is completed the loader is parked in a flat on the ground, and the bucket on the ground, hydraulic control should be hydraulic cylinder retracts,the lever is placed in the middle position, cleaning, lubrication and shut the doors and windows. |